Delivery & installation

From the factory to your garden.

Every pod is wrapped and shipped on its own flat rack, then lifted onto a base we have already built. Scroll to follow an H7 the whole way, from the factory yard to the lights coming on.

01 / 09Wrapped and loaded
01 · At the factory

Wrapped and loaded

Each pod leaves the line finished. It is shrink-wrapped in protective film, netted and strapped to a 40 ft flat rack.

The range is too wide for a closed container, so every pod travels on its own hired flat rack.

02 · Shipping

At sea

The flat rack crosses on the deck of a container ship, on top of the stacks.

Typical lead time is 12 weeks, or 14 for the largest cabins.

03 · Into port

Onto the road

At the port the flat rack is lifted onto a low-loader for the road.

We deliver within 150 miles of Alton.

04 · Meanwhile, on site

The base

A free survey confirms where the pod is best placed, how it gets there and what it stands on.

While your pod is being made, you decide who lays its base: our construction contractors, or your own local ones. It's a slab or pinned pads, quoted separately from the pod.

05 · Install day

Crane arrives

The crane sets up on its outriggers first.

14 m
Most from the crane to the centre of the base
3.6 m
Clear width along the route
4.2 m
Headroom on the approach
06 · Install day

Module arrives

The lorry backs up to the lift position.

At 3.3 m wide, the H7 shown here travels as a wide load.

07 · Install day

The lift

The pod is lifted off the lorry, swung over and lowered onto the base.

08 · Install day

Services

Power, water and drainage will need to be connected.

  • Power
  • Water
  • Drainage
09 · Install day

Handover

Craned into position, and your pod is ready to be switched on.

Delivery in four numbers.

150 miles
Delivery area, measured from Alton
12 weeks
Typical lead time; 14 weeks for the largest cabins
14 m
The furthest the crane works from the centre of the base
1 day
From crane arrival to keys, on a prepared base